The annual target in the context of the restoration work at the Dutch National Monument “The 102,000 stones” is reached. On 12 November 2013 the final annual inspection at the
(...) →The annual target in the context of the restoration work at the Dutch National Monument “The 102,000 stones” is reached. On 12 November 2013 the final annual inspection at the
(...) →